Feature Installations

  1. Solar
  2. Solar Projects
  3. Foodworks Nowra Solar Installation

Foodworks Nowra solar Installation - December 2022

Planned over a three-month timeframe and implemented by the Innovate team in one month, Foodworks Nowra is now set to realise 30-40% reductions in monthly power costs as a result of their solar panel installation. Being a high energy-use business, with refrigeration running 24/7 and lots of cooking happening onsite, this saving is significant.

The solar solution uses robust, long-lasting equipment to deliver 25+ years of service.

Equipment Installed
  • 362 450W Longi HiMo panels
  • Sungrow Commercial Inverters
  • Clenergy Fixed Tilt racking
Details
  • Suburb: Nowra
  • System Size: 163 kw